top of page
1/14
The project involved implementing a new gas collection system to gather and store gas emanating from beneath the current landfill. The tasks included drilling multiple gas collection wells, each reaching a depth of approximately 60 linear ft through the existing waste, and installing over 3,000 linear ft of gas collection piping across the landfill to connect the wells with the existing gas collection system.
bottom of page