Current Projects
Alpha Inc.'s expansive portfolio of site work services, well drilling and design-build communities includes these featured projects.


AC Hotel by Marriott
Wailea, Hawaii
Alpha Inc. provided all the sitework for the four-story 110-room luxury resort featuring an infinity edge pool sitting on three-acres located along the sunny coast of Wailea this hotel was designed by R.D. Olson and opened in May 2021.
Central Maui Landfill Kahului, Hawaii
Completed in 2019, the Central Maui Landfill project involved mass excavation and installing liners for the next phase of the Maui County Landfill. Alpha Inc. was instrumental in working to finish this project on time and meet the needs of the county.




Central Maui Landfill Phase 3A
Started in 2021, the Central Maui Landfill project involved over 200,000 CY of mass excavation, installing liners for the next phase of the Maui County Landfill. Alpha Inc. met a strict schedule to finish this project before the previous landfill cells filled up.
Hoku Nui Microgrids
Makawao, Hawaii
Alpha Inc. was the General Contractor for the construction and maintenance of Hawaii’s 1st Off-Grid Microgrid Residential Development that consists of a 1 Megawatt PV Array, 3 Megawatt Hour Tesla Battery Energy Storage System, 500 kW backup Bio-Diesel Generator and Medium Voltage Transmission and Distribution powering all the properties throughout the 258 Acre community.




Hoku Nui Infrastructure
Makawao, Hawaii
Alpha Inc. provided the infrastructure for the integrated Hoku Nui Subdivision / Hoku Nui Farm, including roads, 2 ag water storage ponds, over 15,000 LF of transmission waterline, a fire/booster pump, a 243,000 gallon potable water tank, over 10,000 LF of electrical duct bank, multiple switchers and transformers, as well as other improvements.
Lower Main Street Sewer Line Improvements
Wailuku, Hawaii
Lower Main Sewer Line improvements, includes the installation of 1900 feet of new 15” PVC Gravity Sewer Line, 180 feet of new 36” HDPE Drain Line, 11 new precast concrete manholes. Work is being performed on a highly trafficked thruway in the heart of Wailuku, challenges include maintaining access to all facilities and the various business with minimal interruptions, Alpha is proud to perform such needed infrastructure improvements as a partner to the County of Maui.




Napili No. 3 WWPS Force Main Replacement
Lahaina, Hawaii
Napili No. 3 WWPS Force Main Replacement, consisted of the installation of 2,000 feet long 16 in PVC Force Main, with various precast concrete manholes, transition manholes, while maintaining service to all existing utilities and facilities within the project limits along Lower Hoonopiilani Road, approximately 1750 linear feet, were excavated while following a strict dewatering program to protect Maui’s waterways and sources from any effluent discharges.
Upcountry Exploratory Well
Makawao, Hawaii
This 2,100’ deep well is one of the deepest wells on island, in addition to drilling and casing the well, this project required a paved road to the well site, and site work to prep the area for future well development.